32

Pipe rupture

Over the last 10 years Norway have seen

a boom in building of small hydropower

plants (< 10 MW). Many of these projects

use buried pipes to transport the water

from inlet to plant. In 2012, around 40

pipe trenches were put into operation. 4 of

these (10 %!) experienced several problems

with pipe rupture. The safety factor on

these pipe trenches is supposed to be 1.5.

The thesis will focus on why these pipes

fail, and try to give some recommendations

on how installation can be improved to

reduce risk of pipe rupture.

Master Thesis

Department of Hydraulic and

Environmental Engineering

Pipe Rupture in Small

Hydropower Projects

By Tor Oxhovd Svalesen

Supervisor: Leif Lia