This is where all of our weekly progress will be recorded

Monday 20/11.23

Today was a very productive day

We tested the flow rate of our vacuum

We measured the air-speed with a wind-gauge and calculated it on this web page
https://www.omnicalculator.com/physics/flow-rate


Air-speed Diameter Volumetric flow(l/min)
Intake 20 m/s 14 mm 185
Outtake 10 m/s 9 mm 38

We concluded to buy the new vacuum and just give it back if it doesn't work.


We continued the testing of the flowrate while we tested the cooling of the system. By measuring the overflow of air, we can see how the vacuum performs while fully connected.


When not fully connected Fully connected
Intake overflow 3 m/s 2,5 m/s
Outtake overflow 10 m/s 8 m/s


We updated the risk assessment to account for dry ice.


We made preparations for the test tomorrow described in the setup section in Final Testing.


We tested our hope from Friday, that our vacuum would keep the temperature stable.


The temperature started out at -23.4

Time(min)

Temperature (C)

0

-23.4

1

-21.8

2

-21.3

3

-20.4

4

-19.7

5

-18.9


This is in no way optimal, but in every way good enough in terms of tissue integrity.

By printing some new adapters we also believe we can increase the effectiveness of the process further.

Tomorrow will be a half-day and the only goal for that day will be to test on our chicken.


Wednesday 22/11.23 




Thursday 23/11.23 






Friday 24/11.23 