Discussion items
- Attending:
- Late-comers:
- Absent:
- Status on project
- Kickoff
- Update on action items:
- SmallSatLab:
- Problems with electrician – bad communication (so there was a stop in progress)
- New meeting today to clarify things
- Acoustic plates to be installed
- Furniture ordered and should be arriving in a couple of weeks
- Problems with electrician – bad communication (so there was a stop in progress)
- Suppliers
Status on Project
- Satellite bus
- Tender closed
- Processing
- Camera control
- Communication
- See separate slide
- Mariusz:
- Finishing proposal for work in G-NAT-lab (attitude control)
- Optimizing mission design work
- 1-2 papers
- Finalizing Mission Analysis Report
- Looking into how San Jose State University manages their students
Communications
- Ground station
- Antennas for measurements
- Public tender?
- Comm. suppliers
- Syrlinks
- IQ Wireless
- Frequency allocation
- Need to start writing the API
- SDR mission
- Started system engineering approach
- Measurements: discussions with Space Norway and Vigo
•Satellite bus
–Tender closed
•Processing
•Camera control
•Communication
–See separate slide
•Mariusz:
–Finishing proposal for work in G-NAT-lab (attitude control)
–Optimizing mission design work
–1-2 papers
–Finalizing Mission Analysis Report
–Looking into how San Jose State University manages their students