  • Attending:
  • Late-comers:
  • Absent:
  • Status on project
  • Kickoff
  • Update on action items:
  • SmallSatLab:
    • Problems with electrician – bad communication (so there was a stop in progress)
      • New meeting today to clarify things
    • Acoustic plates to be installed
    • Furniture ordered and should be arriving in a couple of weeks
  • Suppliers

 

Status on Project

      • Satellite bus

 

      • Tender closed
    • Processing
    • Camera control
    • Communication
      • See separate slide
    • Mariusz:
      • Finishing proposal for work in G-NAT-lab (attitude control)
      • Optimizing mission design work
      • 1-2 papers
      • Finalizing Mission Analysis Report
      • Looking into how San Jose State University manages their students

 

 

Communications

  1. Ground station
    1. Antennas for measurements
    2. Public tender?
  2. Comm. suppliers
    1. Syrlinks
    2. IQ Wireless
  3. Frequency allocation
    1. Need to start writing the API
  4. SDR mission
    1. Started system engineering approach
    2. Measurements: discussions with Space Norway and Vigo

 

 

 

Satellite bus
Tender closed
Processing
Camera control
Communication
See separate slide
Mariusz:
Finishing proposal for work in G-NAT-lab (attitude control)
Optimizing mission design work
1-2 papers
Finalizing Mission Analysis Report
Looking into how San Jose State University manages their students