Phase 4
BuIldIng Process
after all the detailing and drawings were completed, we were ready to
build the star cube. this phase consisted of 2 weeks. the first week
was spent in the workshop at ntnu prefabricating as many elements
as possible so that they just needed to be assembled on site in rindal.
one group was at havdal farm outside trondheim working on the
shingle facade.
after a long and hard week, it was time to transport everything to
rindal and begin assembling the structure. the photos of the process
follow.