To further increase the credibility of the concept we wish to start the semester by drilling in a prostate.

To do this we need permission from Sebastian, Øystein needs vaccinations, and the prototype must be ready for it.


Finishing the prototype

The collett nut turned out not crooked after all. We simply installed it wrong. To install it right one first snaps the collet into the nut and then insert it into the CNC. Only then can you insert the mill bit and tighten.


Before testing can commence some improvements must be done to the prototype. We have to make sure that the sanitation aspect of the prototype is of high enough quality.

Our primary idea is to design a filter adapter for to attach to the tube sucking air out of the vacuum. This would stop biohazard material from entering the vacuum causing further contaminations.

If this was to work as intended, we would be ready for testing. 


As an extra safety measure, testing should be done it a confined space down at St. Olavs.


The test

Nothing have been written here yet.


The results

Nothing have been written here yet.