Determining constraints for data processing for a target of 50x30 km (provides requirements for Idletechs processing
Possible to do the OTFP during the exposure times? Likely better to collect all data then do the processing (another limit on time schedule) - need to see if it can be done less than a minute.
Have 1 minute spare to do processing and then downlink in 1 min