Date

Attendees

Goals

  • Concept document sent out
  • GOMSpace notes sent out
  • Gantt Chart (new)
  • ESA workshop application
  • Presentations on 23. and 24. Nov

Discussion items

TimeItemWhoNotes
    

Action items

  •  

ESA Workshop

  • We are working on the team application. Everyone can contribute to it!

HSI concept document

  • Updated requirements table - can Idletech perform to those requirements? 

Data from HSI

Hardware

  • Distances between lenses fixed (pretty much)
  • Should be possible to finalize the mechanical design by next week
  • Then we can start ordering parts and assemble it over Christmas

Software

  • Test on the projection core
  • Comms. for memory
    • Test this on the test development board soon
  • Bitwidth for loadings and data established?
  • Need to know the data rate

Mission Design

  • Determining constraints for data processing for a target of 50x30 km (provides requirements for Idletechs processing
    • Possible to do the OTFP during the exposure times? Likely better to collect all data then do the processing (another limit on time schedule) - need to see if it can be done less than a minute.
    • Have 1 minute spare to do processing and then downlink in 1 min
  • Precision of imaging

Actions ahead

  • Invite Fred to NTNU so that we can get to know him better and learn more about his system
  • Set it up on an optical table and hopefully get a project on it next fall or thesis next spring - want to optimize the HSI design