We are working on the team application. Everyone can contribute to it!
HSI concept document
Updated requirements table - can Idletech perform to those requirements?
Data from HSI
Hardware
Distances between lenses fixed (pretty much)
Should be possible to finalize the mechanical design by next week
Then we can start ordering parts and assemble it over Christmas
Software
Test on the projection core
Comms. for memory
Test this on the test development board soon
Bitwidth for loadings and data established?
Need to know the data rate
Mission Design
Determining constraints for data processing for a target of 50x30 km (provides requirements for Idletechs processing
Possible to do the OTFP during the exposure times? Likely better to collect all data then do the processing (another limit on time schedule) - need to see if it can be done less than a minute.
Have 1 minute spare to do processing and then downlink in 1 min
Precision of imaging
Actions ahead
Invite Fred to NTNU so that we can get to know him better and learn more about his system
Set it up on an optical table and hopefully get a project on it next fall or thesis next spring - want to optimize the HSI design