Date

Attendees

Goals

  • Mission Design Review 15th Dec
  • Remote Sensing Data Levels
  • Meeting with Fred
  • Next semester plans

Discussion items

TimeItemWhoNotes
    

Action items

  •  

Data from HSI

Unknown User (joaoff) have looked at compression of HICO data. See note on Google Drive. 

Tested various compression methods. And how to slice the cube to do the compression. For images compressed by doing JPEG2000 pr. push-broom frame can be compressed from 43.5 MB to 1.3 MB (factor of 33.5).

Discussions on Table XXIII in the concept document. Values in option 1 through 4 are 100 times too large?

Hardware

  • PCBs into production next week
  • Meeting with Fred. 9th of January - 11th (Joao, Julian, Evelyn, Marius)
  • KSAT 12th of January (Gara, Evelyn, Mariusz, Roger, Egil)

Software

  • Power estimation:

Mission Design

  • Inputs from group
  • Mission Design Review on Friday

 

Communication

  • Try set up a kick-off during January (or February). 

Actions ahead