Initial specifications and requirements for satellite bus

 

ParameterRequirementsJustification
Mechanical subsystem  
Payload physical envelope  
Payload mass  
Camera aperture placementZenith panel
Flush with panel?
 
Power subsystem  
Payload energy consumption3 W for 3 minutes observation pr. passEstimation
Downlink radio energy consumption  
Peak power available  
Communications  
Downlink data rate (usable bits)1 - 2 Mbit

Size of one data packet:

500 pixels x 500 pixels x 2 bytes/pixel x 10 channels = 5 Mbytes = 50 Mbits
50 Mbits / 0.1 Mbits/sec = 500 sec
50 Mbits / 1 Mbits/sec = 50 sec

10 kanaler er typisk det vi får med komprimering i spektralt domene basert på IDLEtechs / Harald Martens teknologi.
I tillegg kan man komprimære i det romlige domenet og oppnå enda større kompresjonsgrad.

Downlink frequency band  
Downlink power/EIRP needed  
Ground station/data access Depending on frequency band
If possible, GS at NTNU, in addition to others
Launch and orbit  
Orbit typePolar (may or may not be SSO)Target area is far north, ground stations expected to be far north
Orbit height400 - 600Low orbit preferable due to better resolution
Orbit inclination  
Other parameters

Ω: 30 - 45 deg


Node drift

Pass should be close to mid-day over target area for best light conditions
Satellite moving south-north gives possibility to download data right after target pass (GS north of pass area)

Should be limited to ensure satellite pass by target area day-time during summer/autumn time

ADCS  
Slewrate (max, precision)2 deg/sIn order to be able to point towards target during a pass
Pointing accuracy0.1 degTBC
Momentum budget Satellite must be able to perform slewing manouver for four consecutive passes