This article summarizes the steps required to upgrade from the rocky release to the stein release of openstack.

Prerequisites:

  • This documents expects that your cloud is deployed with the latest rocky tag(vR.n.n) of the ntnuopenstack repository.
  • Your cloud is designed with one of the architecture:
    • Each openstack project have their own VM(s) for their services
  • You have a recent mysql backup in case things go south.
  • If you want to do a rolling upgrade, the following key should be set in hiera long enough in advance that all hosts have had an puppet-run to apply it:
    • nova::upgrade_level_compute: 'auto'

The recommended order to upgrade the services are listed below:

Keystone

This is the zero downtime approach

Before you begin

  • Set apache::service_ensure: 'stopped' in hiera for the node that you plan to run the rolling upgrade from
  • Login to a mysql node, start the mysql CLI, and run set global log_bin_trust_function_creators=1;

Upgrade-steps (start with a single node):

  1. Add the following lines to the node-specific hiera:
    • apache::mod::wsgi::package_name: 'libapache2-mod-wsgi-py3'
    • apache::mod::wsgi::mod_path: '/usr/lib/apache2/modules/mod_wsgi.so'
  2. Run puppet with the rocky modules/tags
  3. Purge the keystone and apache2 package
  4. Run apt dist-upgrade && apt-get autoremove
  5. Run puppet again
    1. This will re-install keystone (ensure that apache2 does not start - should be ensured by puppet as of the enable: false flag in hiera)
  6. Run keystone-manage doctor and ensure nothing is wrong
  7. Run keystone-manage db_sync --expand
    1. Returns nothing
  8. Run keystone-manage db_sync --migrate
    1. Returns nothing
  9. At this point, you may restart apache2 on this node
    1. Remove the  apache::service_ensure: 'stopped' previously set in hiera.
  10. Upgrade keystone on the other nodes, one at a time
    1. Basically run step 1-5 on the other nodes
  11. When all nodes are upgraded, perform the final DB sync
    1. keystone-manage db_sync --contract

Glance

To upgrade glance without any downtime you would need to follow the following procedure:

  1. Select which glance-server to upgrade first.
    1. In the node-specific hiera for this host you should set: glance::api::enabled: false followed by a puppet-run. This would stop the glance-api service on the host.
  2. Run puppet on the first host with the stein modules/tags
  3. Run apt dist-upgrade && apt-get autoremove
  4. Run glance-manage db expand
  5. Run glance-manage db migrate
  6. Remove the glance::api::enable: false from the node-specific hiera, and run puppet again. This would re-start the glance api-server on this host.
    1. Test that this api-server works.
  7. Upgrade the rest of the glance hosts (ie; step 2 + 3 for each of the remaining glance hosts)

Cinder

To upgrade cinder without any downtime, follow this procedure

  1. Add the following three lines to the node-file of the first node you would like to upgrade:
    1. apache::service_ensure: 'stopped'

    2. cinder::scheduler::enabled: false

    3. cinder::volume::enabled: false

  2. Add the following two lines to the node-specific hiera-file for the node you are upgrading
    1. apache::mod::wsgi::package_name: 'libapache2-mod-wsgi-py3'
    2. apache::mod::wsgi::mod_path: '/usr/lib/apache2/modules/mod_wsgi.so'
  3. Run puppet on the first host with rocky modules/tags
  4. Run apt dist-upgrade && apt-get autoremove
  5. Run cinder-manage db sync
  6. Remove the lines added at step 1, re-run puppet, and test that the upgraded cinder version works.
  7. Perfom step 2-4 for the rest of the cinder nodes

Neutron

To upgrade neutron with minimal downtime, follow this procedure

API-nodes

  1. Pick the first node, and run puppet with the rocky modules/tags
  2. Run apt dist-upgrade && apt-get autoremove
  3. Run neutron-db-manage upgrade --expand
  4. Rocky will upgrade to FWaaS V2, run neutron-db-manage --subproject neutron-fwaas upgrade head to prepare the database
  5. Restart neutron-server.service and rerun puppet
  6. Upgrade the rest of the API-nodes (repeating step 1, 2, 5)
  7. Stop all neutron-server processes for a moment, and run:
    1. neutron-db-manage upgrade --contract
  8. Re-start the neutron-server processes

Network-nodes

WARNING: Upgrading from queens→stein directly does not work automaticly, so if this is your upgrade-path you should expect the need for some 'apt-get purge neutron-* && apt-get autoremove' and then re-run puppet. Alternatively just simply reinstall the network-nodes.

  1. Run puppet with the rocky modules/tags
  2. Run apt dist-upgrade
  3. Rerun puppet and restart the service
    1. systemctl restart ovsdb-server
    2. systemctl restart neutron-dhcp-agent.service neutron-l3-agent.service neutron-lbaasv2-agent.service neutron-metadata-agent.service neutron-openvswitch-agent.service neutron-ovs-cleanup.service