Sub projectTasksUseful literature
Reliability and safety
assessments
of subsea systems
  • Make a description of the subsea system agreed upon
    • Functional description
    • Failure modes and failure classification
    (A possible case study is blowout preventer (BOP) due to the extensive amount of information available, or alternatively,
    the autonomous high integrity pressure protection system (HIPPS) that is often installed in relation to subsea tie-ins)
  • Identify and discuss applicable reliability and safety challenges in relation to the operation of such systems
  • Identify and describe relevant regulations and standards that apply for design and operation of this system
  • Identify and discuss relevant measures in relation to safety and reliability assessments of the system
  • Identify and compare methods used to assess reliability in literature for the system being considered
    and/or of systems that share key properties of this system, and discuss the pros and cons
    of the different approaches
    • (A selection on methods may be selected)
  • Identify and discuss key parameters for reliability assessment, and the availability to data that may
    support such assessments
  • Identify ideas for further work

The project tasks are carried out with basis in a thorough literature review that is documented in the report.

 

Relevant literature will depend on the application, and may include:

  • Regulatory webpages and regulations (giving overall requirements, and references to applicable standards)
  • Standards and industry guidelines, that give more detailed requirements on methods and practices
  • Patents as a useful source of having detailed description of system elements
  • Scientific publications, that include proposals for new methods or the results of case studies
  • Books, such as https://www.ntnu.edu/ross/books/sis.

 

kManagement of RAMS in design
of critical infrastructures(road) infrastructures

  • Give a description of the E-39 Ferry Free project and identify and discuss some of the challenges faced that
    may be attributed to reliability, availability, maintainability/maintenance, and safety
  • Define what we mean by RAMS management, and the typical activities involved, with basis in a literature survey.
  • Give a more thorough description of the RAMS management system used in railway industry with basis
    in EN 50129, and supplemented with scientific publications, reports and industry guidelines.
  • Identify RAMS activities in relation to critical road infrastructures, like tunnels and bridges
  • Make a comparison of the approach to RAMS management in railway and critical road infrastructures,
    and point at some of the areas where improvements are needed.

     
To be specified