...
- IMT3005 - Infrastructure as code
- H17: Unknown
- IMT3003 - Service Architecture Operations
- V18: 34 groups, each with 15VM's, 15CPU's, 30GB RAM, 20GB Cinder.
- Two of the groups were exmanded to 20VM's, 20CPU's and 40GB RAM mid-semester
- V18: 1 group with 40VM's, 80 CPU's, 160GB RAM for traffic-generation.
- V18: 34 groups, each with 15VM's, 15CPU's, 30GB RAM, 20GB Cinder.
- IMT3491 - Ethical hacking
- H17: 1 large project with 60VM's, 90CPU's and 192GB RAM
- Was expanded to 130VM's, 200CPU's and 348GB RAM V18 for some master course.
- H17: 1 large project with 60VM's, 90CPU's and 192GB RAM
- IMT2681 - Cloud Technologies
- H17: 78 students, each with 3VM's, 3CPU and 6GB RAM.
...