Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Date

Attendees

Goals

  1. Status
  2. HSI prototypes
  3. FPGA processing characteristics
  4. SmallSat November meeting recap
  5. Mission design
  6. Meeting with Fred 11-15 December (week 50) in Trondheim, Tromsø or Svalbard
  7. Energy budget & link budget
  8. Trade-off analysis and ROM
  9. ESA application
  10. Gantt Chart
  11. Balloon test + gimbal
  12. http://www.smallsat.uga.edu/research

Discussion items

TimeItemWhoNotes
5 minHSIUnknown User (joaoff)
  • Status
  • EMSC
5 minSoftwareUnknown User (orlandic)
  • Status
  • Bitwidth
  • Power consumption
5 minHardwareUnknown User (julianve)
  • Status
  • Prototypes
  • Future
5 minMission DesignMariusz Eivind Grøtte
  • Status
  • Recap
  • Mission phases
  • Energy budget
5 minSystems DesignEvelyn Honoré-Livermore
  • Status
  • ROM
2 minComms.Unknown User (garaq)
  • Status
  • Link budget
33 minOtherAll
  • Gantt chart
  • ESA application
  • Meeting with Fred
  • Other

Action items

  •  

Data from HSI

  • EMSC

Hardware

  • Prototypes

Software

  • Bitwidth for loadings and data need to be established 
  • Speed and power consumption

Mission Design

  • Recap on seminar results
  • SNR
  • Attitude control
  • Updating concept document
  • Mission phases
  • Energy budget

 

Systems Design

  • Trade-off analysis between providers
  • ROM

Actions ahead