  • Any updates on Gantt chart?
  • Follow ups on action items
  • Status and challenges

Standup items

TimeItemWhoNotes
5 minHSI dataUnknown User (joaoff)
  • Follow-up actions
  • Status
  • Challenges
5 minSoftwareUnknown User (orlandic)
  • Status,
  • challenges
5-10 minHardwareUnknown User (julianve)
  • Follow-up actions
  • Status,
  • challenges
5 minIdleTechsJan Otto
  • Follow-up actions
  • Status,
  • challenges
5 minMission DesignMariusz Eivind Grøtte
  • Follow-up actions
  • Status,
  • challenges
5 minThermalUnknown User (sivertba)
  • Status,
  • challenges
5 minComms.Unknown User (rogerbi)
  • Follow up actions
  • Status,
  • challenges

Action items

Status on follow-ups in last weeks meetings

 

Data from HSI

  • Joao is writing a report on what has been done on HSI imaging with drones.
  • Developing a statistically sound method for determining signal/noise levels.
  • Working on SNR number
  • Working on what has been done in three drone campaigns

Hardware

  • Julian has ordered HW parts (devboard etc.)
  • Mariusz has designed the CAD for HSI lenses (more action items on it below)
    • Focal lengths should be ok but unsure about apertures
    • Julian needs to see how it fits on PCB
  • First PCB still in revision
  • Please put in more here Julian

HSI Camera discussion

  • Going through Fred’s calculations for version 4
  • Slit width too small?
  • Bits/pixel
  • Binning

SNR

  • Treating it differently than usual definition
  • Generalizing such that we take out what we want to see, but treat unwanted spectral responses as noise
  • Read-out noise, background noise, dark current noise
  • RMS values assumed (not peak values)

Software

  • Software architecture
  • Talks about stages of processing
  • Please put in here Milica

IdleTechs

  • A memo for data compression has been started on, 
    • listing some requirements for compression
    • outlining a solution
    • commenting on how well the suggested solution fits to the requirements.  
  • A copy can be found in the project wiki.
  • A preliminary estimate indicates that the data from one patch can be compressed to be downloadable in less than one minute through a 1 Mbit/s link (S-band).

Communications

  • None

Mission Design

  • Has investigated on technicalities for slewing maneuver such as:
    • Pitch-Roll-Yaw sequence (what order is optimal in terms of time and energy)
    • Investigated slewing functionality in STK
      • Set 1 deg/s and 0.1 deg/s^2 constraints
      • Max slew time = 30 sec
      • Adaptive step size control
      • Start slew at line of sight
      • GSD = 100 m
    • Need to figure out power consumption
    • Limitations on ground precision
  • Analysis of time-window for observation (morning), 3 access times (4th is not viable)
    • First pass: 1 min
    • Second pass: 3 min
    • Third pass: 55 seconds
  • Lost access to license for EOIR-add on in STK but
    • Done some reading on how it works
    • integrate with MODTRAN (separate software costs 4000 USD)
    • may get spectral response with own-defined resolution (transmission and reflectance)
    • may model BRDF properties of ocean
    • photon flux/photon detectors
    • assumes unpolarized sensor
    • saturation may be enabled
    • Figures out SNR due to sensor dark noise and scene photon noise (background radiance/electrons)
    • Expect graphs/simulations/results next week!

Actions ahead

  • Mariusz: Request requirements for the RCN technical report due 10th Nov (and review presentation 6th of December) from Tor Arne
  • Mariusz and Julian: Get information on the dimensions of Fred’s lenses for CAD drawings
    • Lenses aperture
    • Lenses focal length
    • Slit width and height (seems extremely small??)
    • Get a person/student to do the mechanical drawings
  • Mariusz and Julian: Find a student for thermal testing (both physical hardware and thermal simulations for CAD)
  • Mariusz and Julian: Draw a prototype CAD for encasing around lenses (the CAD we have now is difficult)
  • Roger: access to wiki for Jan Otto and Julian
  • Simulate slew maneuver with specified push-broom scanning and GSD<100 m
  • Find student to do JPEG2000 compression
  • All: update Gantt chart