Deliverables submitted April 2010
Some presentations from ECER are available on the events page.

The first major deliverables have been sent to the EC today, comprising the WP2 and WP3 preliminary reports (deliverables 2a and 3a). The report can be found on the Work Package 2 page.

15/12/09
The Spanish national workshop took place in Madrid on 14th December. With the exception of the English workshop, which will be held in April, this brings the national workshop programme to a successful conclusion. The results from the workshops will be collated and presented as the S-TEAM Work Package 2 interim report (possibly with a more interesting sub-title). This will be discussed and finalised at the S-TEAM meeting in Nottingham between 8-11 January 2010.


Table Cell (td)
classsidespalterTd2


Panel
Table Row (tr)