Date
Attendees
Discussion items
- HYPSO schedule discussion
- Organizational structure
- SDR mission
- Ground station
Agenda from email
- Updated schedule for HYPSO in detail incl. schedule showing critical events (PDR, CDR, EM and FM arrival)
- Org. structure discussion
- Status and schedule of ground station design/implementation/test — fundamental question is….when will we have a GS in TRD up and running?
- Charting of schedule for all ‘critical’ folks from now till Dec 2019 — time off/holidays etc — this is important to plan ahead for things we know, so we can deal with things we don't
- Status of plans for (undergrad + Masters) student recruitment to launch/checkout/test/operate s/c
- How to have more faculty engagement (besides TAJ) in all meetings where critical issues are discussed
- Check on plans for academic work for Evelyn, Mariusz, Elizabeth, Alberto — how/when/where in the light of a very tight next year for launch prep (see item #4 above in particular)
- Status of recruiting non-critical folks (e.g. development of web pages, helping setup ground station networking etc) for HYPSO
- Status of Fortuna/IdleTechs and a schedule by when they will depart from all s/c activities
Action items
- Unknown User (garaq) and Unknown User (livermor) plan SDR payload
- Unknown User (garaq) prepare requirements document for SDR mission as secondary payload. Final description by PDR
- Unknown User (eeide) and Unknown User (rogerbi) will continue on the architecture for the ground station
- Unknown User (livermor) look into online communication and update of project schedule (easy interface)
- Unknown User (torarnj) must figure out things with Idletechs
All other business
- TAJ is preparing an application to RCN
- Next Friday: visit from Christian Hauglie-Hanssen (new director of NSC) + Frank Udnæs and others
- Strategic discussion on micro-satellites in Norway
- TAJ has already asked for 500 MNOK for infrastructure application - deadline 10 October (writing in September). Martin Ludvigsen is lead.
- Spaceport Trondheim preliminary dates 5-9 September 2019
SDR Mission
- The frequencies that are we want for the SDR mission are not the same as the ones that are on the satellite.
- NKOM might care
- We can use a GPU if things are like this.
- Power budget?
- The power budget is not a problem because the power available is much bigger than anticipated
- And we would run these operations in the off-season of the algal bloom
- Does the switching work between the radios as expected?
- Mission objectives:
- Set up a radio link between the satellite and autonous vehicle - establishing the network
- Plus multi-user schemes for arctic nodes with Arctic ABC
- Schedule
- We can see what hardware fits within the satellite bus
- Will now test and see which hardware is suitable to the mission
- Plan schedule next week (20th-24th of August)
- Open items:
- Antenna switching
- NKOM allowance
- The radio in the first mission will be different from the second mission
- There is a risk of adding a second payload to the satellite, but there will be decision gates where the maturities of the payloads will be assessed and then decided
- We have a mission redundancy by having two payloads
- PDR: research goals and requirements for SDR plus conops
Ground station
- The lead time is quite long for the companies who are not GOMSpace
- Need to look at Kongsberg SpaceTec too
- Will need more formal quotations in the next iterations after we rule out some of the companies
- The satellite will be in space in end of next year
- The ground station should be here next summer - so we have half a year to work with it
- Open access of ground stations - SatNogs
- Gives us possibility to use other people's ground stations
- Can the satellite be hijacked? Is there a risk?
- We need to get an overview of the infrastructure needed for ground operations
- Both the ground station itself
- And supporting blocks
- Communication where internet is the end point
- The less changes we do with the infrastructure at NTNU the easier it is to keep the permissions we have
- Will recruit a new set of people for Fall-19/Spring-20 to work on it
Holidays
- Should be able to organize the schedule and people around the holidays
Recruitment
- Will not focus on recruiting more people to the project now
- Will focus on creating content to publish on the NTNU web page
- If people volunteer to do something, they can go ahead
Idletechs
- Agree that the collaboration hasn't been optimal
- No parts have gotten what they expected or wanted
- Too little follow up
- Wanted to get help on how their software could be useful for the smallsat and help us implement it
- Did not happen
- Both Idletechs and we are quite unhappy about it
- They are looking at how we can work together
- Specific deliverables and resources
- Will look into how the money can be reallocated as well with NSC
- We are not dependent on them and their contribution
Roles
- How to ensure faculty engagement or not
- The team has not been fully engaged the past year/or a good enough team
- Working on how to do this better this year - to become a team and work together and find the passion and ownership we need to execute the project
- The faculty should act as advisors, need to make this possible
ADCS
- Critical to have enough momentum on this
- Need more simulations and testing
- Look into what people and resources can support Mariusz on this