Viability of using a bituminous sub-ballast layer on high-speed ballasted tracks

Auteurs-es

  • P.F. Teixeira PhD, Dipl-Ing., Researcher at the Center for Innovation in Transport (CENIT) of the Technical University of Catalonia (UPC), Barcelona, Spain.
  • A. López-Pita Professor of Railways, Technical University of Catalonia (UPC). Director of the Center for Innovation in Transport (CENIT), Barcelona, Spain.

Mots-clés :

Track, High-speed, sub-ballast, Bituminous layer

Résumé

The design of higher quality infrastructures reducing its life cycle costs is a major priority to increase the profitability of high-speed railway lines. The experience gained so far has evidenced the influence of track configuration on its maintenance costs. Recent railway research has shown that to fulfil a reduction of those costs one should act optimizing both the resiliency of the fastening system and the subgrade-sub-ballast system. With reference to this last aspect, the aim of this paper is to expose the first results obtained on a research project carried out by the authors concerning the viability of using a bituminous mix sub-ballast layer on the new Spanish high-speed lines. The interest of this solution to increase long-term performance of the track is discussed based on the available experience. Furthermore, the results of a parametric study evidences in what terms this solution can be technically feasible to reduce maintenance costs and increase service life of ballasted highspeed tracks.

Téléchargements

Les données sur le téléchargement ne sont pas encore disponible.

Téléchargements

Publié-e

2019-08-01